The Ross bridge contract
for Cornwall county council

The refurbishment of the Ross swing bridge was carried out in-situ with special regard to environmental impact. The structure was scaffolded and shrink-wrapped to contain any contamination and then abrasive blast cleaned, hot-metal sprayed and painted before the coverings were removed.

The Bridge in situ

Bridge fully enclosed for work

Metal spraying

Bridge structure exposed

Metal spraying

Metal spraying